Case Studies
CASE STUDY | Manufacturing Facility Improves Operations and Saves Capital Expense with a Rental Cooling Solution
A manufacturing facility in North Central Texas faced another summer of extreme heat and continued challenges in maintaining safe indoor working conditions. Previous attempts using smaller cooling units had provided limited success, and rising temperatures
CASE STUDY | JetHeat Units Maintain Ideal Conditions on Upper Floors
A multi-story construction project in Texas required consistent heating across large floor plates measuring approximately 100,000 square feet per level. The general contractor initially relied on a conventional rental heater previously used on other projects,
CASE STUDY | A Multi-Year Infrastructure Project Supported by Reliable Heating and Climate Control
Constructing a large hydroelectric dam in northern British Columbia required placing more than 2 million cubic meters of concrete over several years. Extreme winter conditions made heating and climate control critical to nearly every phase
CASE STUDY | Saving Labor, Reducing Emissions, and Gaining Data with Solar Hybrid Light Towers
While constructing a new manufacturing facility in Texas, a large international technology company faced growing inefficiencies with its existing solar light towers. Although the lighting supported sustainability goals, the labor required to operate the units
CASE STUDY | Construction Project in the Midwest
Midwest required reliable interior heating during winter conditions. With a floor plan spanning more than 3 million square feet, maintaining consistent indoor temperatures presented a significant challenge.
CASE STUDY | Business Operations Restored with a Rental Cooling Unit
During the peak of summer in Texas, a rooftop air conditioning unit failed at a storage and distribution facility. With temperatures at their highest, indoor conditions quickly became unsafe for employees, forcing the facility to