Service you trust. Equipment you need.

Williston

Williston, North Dakota

Williston

Address

5245 142nd Dr. NW
Williston, ND, 58801

Hours

Monday  7:30am–5pm
Tuesday  7:30am–5pm
Wednesday  7:30am–5pm
Thursday  7:30am–5pm
Friday  7:30am–5pm

Saturday  Closed
Sunday  Closed

Ask Us About Our 24/7 Service Support

Static Location Map for Williston

In-Store Rental Inquiries

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Name*
This field is hidden when viewing the form
Terms and Conditions*

Top Rentals

Browse equipment at this location

Equipment Rentals in Williston, North Dakota | Serving the Bakken Formation, North Dakota Oil Country & the Northern Plains

Williston, North Dakota, was a quiet agricultural city of roughly 12,000 people before the Bakken Formation’s horizontal drilling revolution transformed it into one of the fastest-growing communities in the country. The discovery that the massive shale deposits underlying the Williston Basin could be economically produced using horizontal drilling and hydraulic fracturing sparked a boom cycle that brought tens of thousands of workers, billions of dollars in infrastructure investment, and a construction market that overwhelmed every existing supply chain. The subsequent price cycles have brought the boom down and brought it back up. The Bakken’s infrastructure is now permanent, and the construction activity that maintains and expands it is ongoing. 

What sets the Bakken apart from every other oil field in the REIC Rentals network is not the production volume or the infrastructure complexity. It is the cold. North Dakota’s winters are among the most severe in the continental United States. Williston regularly records temperatures below minus 40 degrees Fahrenheit during the coldest weeks, and the combination of sustained extreme cold and the persistent wind sweeping across the unprotected high plains creates operational conditions unlike anything a contractor encounters in the Permian Basin or any other warm-weather energy market. Operating here is a technical challenge that starts with heating and does not end with it. 

REIC Rentals in Williston serves this territory with heatingcoolingdehumidification, and HVAC accessories built for the most extreme operating environment in our network.

The Bakken Formation: North Dakota's Oil Country and the Northern Plains

Our Williston location serves the full Bakken territory in northwestern North Dakota: Williston, Watford City, Tioga, New Town, Crosby, and Stanley. South on US-85, we serve Dickinson. North and east, we serve Minot. West into Montana, we cover Sidney, Glendive, Wolf Point, and Glasgow. This territory is large, remote, and defined entirely by the energy production that drives every economic activity within it.

Oil, Gas, and Energy Infrastructure Construction

Oil and gas construction in the Bakken is the reason this location exists. Well pad construction, gathering and water-handling pipeline installation, saltwater disposal facility construction, compression and processing plant development, and the ongoing infrastructure maintenance and upgrade cycle of a mature, active field define this market. No construction activity happens in Williston and Watford City that is not connected to the energy economy. 

Flameless heating for oil field operations is especially critical here. At minus 40 degrees Fahrenheit, any worker exposure outside a heated enclosure is a safety emergency, not an inconvenience. Our Jet Heat flameless heaters are designed and maintained for the extreme cold of the Bakken, with high output and flameless operation that eliminates ignition risk in hydrocarbon-rich environments. Enclosed facility construction and maintenance in Bakken conditions require heating to maintain safe working temperatures when wind chill drives the apparent temperature to minus 60 degrees Fahrenheit or lower. The documented oil production cost savings from Jet Heat in Bakken-type operations quantify the efficiency benefits of high-output single-unit flameless heating compared to alternative approaches that consume more fuel and deliver less controlled heat in extreme cold.  

Pipeline and storage tank construction and maintenance in the Bakken’s gathering and transmission systems create specific coating application challenges: surface temperature must be elevated above ambient conditions and within the coating specification range simultaneously, which requires environmental control equipment that performs reliably at the temperatures the Bakken delivers.

Construction equipment and generators at a rental site in Williston, North Dakota.

Extreme Cold-Weather Heating

If there is a single message about construction in the Williston Basin, it is this: plan the heating before everything else. At minus 40 degrees Fahrenheit with a 30 miles per hour wind, the effective temperature on an unheated construction site poses a documented life-safety risk. Jet Heat flameless heaters for Bakken construction are not supplemental climate comfort. They are the operational foundation that makes every other construction activity possible from October through April.  

Cold-weather concrete curing in North Dakota winter conditions requires sustained heat on a scale that standard cold-weather procedures do not address. Pouring concrete at minus 20 degrees Fahrenheit ambient is an extreme cold-weather engineering challenge that requires equipment sized for actual Bakken winter conditions, not regional averages. Ground thaw heaters extend the well pad construction season by weeks in both directions, compressing the freeze cycle’s impact on project timelines. Remote equipment protection in cold weather is equally critical: at Bakken temperatures, unheated equipment left overnight at a remote well pad can fail to start the next morning, and our team builds cold-weather operational planning into every Bakken equipment deployment.

Nighttime image of REIC Rentals equipment with bright light overhead.

Temporary Power for Remote Northern Plains Operations

The Bakken’s well pads and gathering infrastructure are distributed across a territory the size of several eastern states, much of it without utility service. Generators are not backup equipment in this market. They are the primary operational infrastructure for construction and maintenance at remote sites. We carry continuous-duty generator sets with cold-weather starting systems standard on all units deployed in this territory, sized to simultaneously support combined construction electrical, heating, lighting, and security system loads. Light towers support the extended winter operations that Bakken construction runs through the short North Dakota days. From October through March, usable outdoor daylight at Williston’s latitude is limited to less than 10 hours, and construction programs running on production timelines extend beyond that window every day.

Portable generator on construction site with exhaust duct and graffiti wall.

Pipeline Coating and Industrial Support

Coating and curing equipment for pipeline and tank applications in extreme cold conditions requires environmental control units that maintain the required application conditions regardless of ambient temperature. The Bakken’s pipeline coating specifications require surface temperature and dew point control that is more demanding at minus 20 degrees Fahrenheit than in any other environment our network serves. Our team is experienced in cold-weather application planning for Bakken pipeline work and sizes environmental control equipment to the specific coating specification and ambient conditions required by your project.

Community and Infrastructure Construction

Williston, Watford City, Dickinson, and Minot community infrastructure construction continues as the permanent population created by the energy economy requires ongoing investment in schools, roads, water and sewer systems, and community facilities. Residential and commercial construction in the basin communities serves the permanent workforce required by the Bakken’s mature production phase, generating steady demand for climate control alongside energy infrastructure work. Sidney, Glendive, and the Montana side of the Bakken add agricultural and ranching community construction alongside the energy infrastructure that extends across the state line. 

Call our Williston team or request a quote online. The Bakken’s construction market operates in conditions that most equipment providers are not built for. We are.

Bakken Construction Does Not Benefit from an Owned Fleet

The Bakken’s boom-and-bust cycle history is the most compelling argument against investing in an owned fleet in any oil field market. The contractors who built owned fleets at peak-cycle pricing and carried those assets through the 2015 and 2020 price collapses learned an expensive lesson. The contractors who rented scaled their capacity to the actual workload in both directions and survived both downturns. The extreme operating conditions also accelerate equipment wear beyond anything that temperate-climate maintenance schedules account for. Cold-start failure, hydraulic seal degradation at extreme temperatures, battery performance at minus 40 degrees Fahrenheit, and the cumulative effect of operating equipment in the most demanding thermal environment in the lower 48 states all create accelerated depreciation that owned-fleet economics do not easily absorb. Rental equipment maintained on schedules calibrated for Bakken conditions arrives ready to work.

Delivering to the Bakken and Across the Northern Plains

Our Williston location is positioned on US-2 and US-85 at the center of the Bakken’s production geography. Watford City is 40 miles south. Tioga is 45 miles east. Dickinson is approximately 100 miles southeast on US-85. Minot is approximately 120 miles east on US-2. For the Montana markets, Sidney is approximately 47 miles northwest, Glendive is approximately 100 miles west, and Glasgow and Wolf Point are reached via US-2 west. For remote well pad and gathering system sites, our team coordinates delivery logistics, access conditions, and cold-weather contingency planning with your field operations supervisor before committing to a delivery schedule.

Frequently Asked Questions

Can you supply heating for construction at minus 40 degrees Fahrenheit in the Bakken?  

Yes. Our Jet Heat flameless heaters are designed and maintained for the extreme cold the Bakken delivers. At minus 40 degrees Fahrenheit, heating is a life-safety requirement for enclosed construction, not a comfort measure. Our team discusses heating capacity requirements based on enclosure size and expected low temperatures, and our 24/7 support line is available when conditions change unexpectedly.  

What generator capacity do you carry for remote Bakken well pad and gathering system sites?  

We carry continuous-duty generator sets with cold-weather starting systems standard for all units deployed in the Bakken territory, sized for primary power at remote construction sites with combined electrical, heating, lighting, and security loads.  

Can you support pipeline coating work in North Dakota winter conditions?  

Yes. Pipeline coating in extreme cold requires environmental control equipment that can simultaneously raise the pipe surface temperature above ambient conditions and within the coating specification range, even when the ambient is minus 20 degrees Fahrenheit or colder. Our team is experienced in the cold-weather application planning required for Bakken pipeline work and provides environmental control units appropriate to the specific coating specification and ambient conditions. 

Do you serve Dickinson, Minot, and the Montana Bakken markets from Williston?  

Yes. Dickinson is approximately 100 miles southeast on US-85, Minot is approximately 120 miles east on US-2, and Sidney, Montana, is approximately 47 miles northwest. All are within our delivery territory on scheduled rotations. For Glendive and Glasgow, Montana, additional distance requires more lead time. Call our team with your project location and schedule to confirm delivery logistics. 

How do you handle equipment performance issues caused by extreme cold in the Bakken?  

Cold-weather equipment issues in the Bakken are our most common emergency service situation, and our response plan reflects that. When you call our 24/7 support line, our team will assess whether the issue can be handled with on-site service or requires dispatching replacement equipment, provide a realistic timeline for either response, and keep you informed throughout. We do not make commitments we cannot keep at Bakken distances in Bakken weather. 

Can you support large multi-phase oil field infrastructure programs in the Bakken? 

Yes. Our Williston location has access to the full REIC Rentals network. For multi-phase Bakken programs spanning well pad construction, gathering line installation, and processing facility development, we plan equipment availability and delivery logistics across the full program timeline. Engage our team at the planning stage and we will build a supply plan that covers every phase.

REIC Rentals Safety

What are you looking for today?