Finishing Stages of Construction in Minnesota – Heating For Contractors, Materials and Equipment

A repeat customer of REIC Rentals requested climate control equipment for several stages of construction on a new building in Minnesota. The contractor approached REIC well before the project broke ground and had outlined the stages that would require climate control. REIC had provided heating the previous year during the brick and concrete phases, cooling and dehumidification during the summer, and was now asked to return for another winter to provide heating for the final stages.
Temporary Heating for New Construction of a Hotel During Winter in Minnestoa

With the winter approaching, a longtime customer of REIC Specialty reached out for help during the interior work of a new construction project. The four-story hotel under construction had exterior framing complete and the building was moving to interior work, including drywall.
Oil Production Site Learns Benefits and Cost Savings of Jet Heater

During a visit at a production pad where workover activity was being performed, a REIC sales rep noticed rental heaters already in use on the site. After a short conversation they asked the site manager if they would like to experience an alternative?
Multi-Year Dam Construction Project Relied On REIC For Heating And Climate Control, Year After Year

Constructing a dam with more than two million cubic meters of concrete requires a massive effort of manpower and equipment. Year after year as the project continued, REIC became more essential to the success of this project than ever imagined.
Manufacturing Facility Addresses High Humidity with Temporary Dehumidification, Protecting Production and Reducing Costs

Missouri – Despite having an advanced HVAC system, a large manufacturing plant faced significant challenges in controlling indoor humidity levels. High humidity was causing product clumping, machinery jams, and frequent production line shutdowns, resulting in substantial financial losses. Nearly 70% of their product was rendered unusable due to humidity-related issues, so the facility knew a solution was critical. After initial discussions, REIC Rentals was brought in to evaluate the situation and recommend an action plan.
Industrial Project Climate Control Ensures Paint Protection for Wisconsin Industrial Tank Project

Wisconsin – An industrial painting company undertaking the first phase of an interior tank painting project enlisted REIC Rentals to manage climate control. With a diameter exceeding 200 feet and a floating ceiling, the tank required surface blasting and steel preparation ahead of the industrial paint application in phase two.
REIC Rentals Controls Humidity In Agricultural Storage Facilities Across The Midwest

Illinois – Facing persistently high humidity levels in several facilities, the plant managers of a national agricultural storage company convened to address the issue. Their primary goal was to ensure the long-term storage of agricultural products. However, their data revealed that elevated humidity levels were compromising the viability of their products—and their revenue.
Construction Heating At Connecticut University Keeps Workers Safe And Projects On Schedule

Connecticut – As fall and winter approached, the contractor overseeing the construction of a new university building recognized the urgent need for climate control. With concerns about worker safety, protecting building materials, and maintaining the construction schedule, colder weather posed significant risks, including missed deadlines. Heating the site was essential to mitigating these challenges.
New Construction Project In Connecticut Benefits From Temporary Heating To Complete Interior Work

Connecticut – As the colder fall months settled in, outdoor work became increasingly challenging—especially for the construction of a multi-story building. Recognizing the risk of slowed progress and worker safety concerns, a New England contractor returned to REIC Rentals for a customized heating solution tailored to the project’s needs.
Temporary Heating to Battle the Cold at an Illinois Warehouse and Distribution Center

Northern Illinois – After several winters of relying on small, portable heaters with limited success, a Northern Illinois warehouse and distribution center upgraded its temporary heating approach. Unable to absorb the cost of a new permanent HVAC system, the company had relied on temporary heating in previous years. While the smaller heaters provided some relief, they were costly to operate due to high fuel consumption. Seeking a more efficient and cost-effective solution, the company turned to REIC Rentals for recommendations.