Service you trust. Equipment you need.
Oil rig drilling platform in snowy night, REIC Rentals industrial equipment, winter drilling site,夜间夜景场景.

Case Studies

Rustic indoor event space with wooden walls and tables for gatherings.

CASE STUDY | Discrete Temporary Cooling for a New Jersey Event Facility

The scale and complexity of the project demand reliable equipment availability, responsive service, and a rental partner capable of adapting to shifting demands across phases spanning several years.
REIC Rentals blue Genie telehandler on flatbed trailer at construction site.

CASE STUDY | Redmond Airport Expansion: Supporting A $180 Million Infrastructure Project

The scale and complexity of the project demand reliable equipment availability, responsive service, and a rental partner capable of adapting to shifting demands across phases spanning several years.
Industrial cooling units and piping for VFD room in oil and gas plant in Texas.

CASE STUDY | Emergency Cooling for VFD Room | Oil & Gas | Texas

REIC Rentals was called to support a critical operation at an oil and gas facility in Garden City, Texas, following a failure of the existing cooling system.
Climate control units for event cooling and heating solutions.

CASE STUDY | Event Climate Control For Philadelphia Charity Gala

Every fall, the Children’s Hospital of Philadelphia (CHOP) hosts a high-profile charity gala at the Philadelphia Navy Yard — one of the city’s most anticipated events of the year. This year’s gala took place inside
Mobile cooling units providing temporary climate control for construction project.

CASE STUDY | Temporary Cooling and Service Help Construction Project Reach Scheduled Milestones

A large multi-building construction project in Texas required reliable climate control as work transitioned from winter heating to summer interior finishing. With several buildings active across the campus, maintaining consistent temperature and humidity conditions was
Portable cooling unit used in mining industry for emergency temperature control and operational rest.

CASE STUDY | Emergency Cooling Rental Helps Mining Restore Operations

A mining and processing facility in Ontario, Canada, experienced unexpected operational shutdowns during periods of extreme heat. As ambient temperatures rose, sensitive electronic equipment began triggering “heat trip” sensors, forcing critical systems to shut down
REIC Rentals Safety

What are you looking for today?