Case Studies
CASE STUDY | Redmond Airport Expansion: Supporting A $180 Million Infrastructure Project
The scale and complexity of the project demand reliable equipment availability, responsive service, and a rental partner capable of adapting to shifting demands across phases spanning several years.
CASE STUDY | Emergency Cooling for VFD Room | Oil & Gas | Texas
REIC Rentals was called to support a critical operation at an oil and gas facility in Garden City, Texas, following a failure of the existing cooling system.
CASE STUDY | Event Climate Control For Philadelphia Charity Gala
Every fall, the Children’s Hospital of Philadelphia (CHOP) hosts a high-profile charity gala at the Philadelphia Navy Yard — one of the city’s most anticipated events of the year. This year’s gala took place inside
CASE STUDY | Temporary Cooling and Service Help Construction Project Reach Scheduled Milestones
A large multi-building construction project in Texas required reliable climate control as work transitioned from winter heating to summer interior finishing. With several buildings active across the campus, maintaining consistent temperature and humidity conditions was
CASE STUDY | Emergency Cooling Rental Helps Mining Restore Operations
A mining and processing facility in Ontario, Canada, experienced unexpected operational shutdowns during periods of extreme heat. As ambient temperatures rose, sensitive electronic equipment began triggering “heat trip” sensors, forcing critical systems to shut down
CASE STUDY | Manufacturing Facility Improves Operations and Saves Capital Expense with a Rental Cooling Solution
A manufacturing facility in North Central Texas faced another summer of extreme heat and continued challenges in maintaining safe indoor working conditions. Previous attempts using smaller cooling units had provided limited success, and rising temperatures