CASE STUDY | Construction Heating Case Study: High-Rise Construction

A multi-story high-rise construction project in a major city required a dependable temporary heating solution to stay on schedule. More than 60 floors were under construction, with 16 mid-level floors requiring continuous heat for concrete curing and worker comfort.
CASE STUDY | REIC Rentals Industrial Warehouse Heaters: Keeping Projects Moving Year-Round

A large commercial construction project on the outskirts of a major city required reliable heating to continue operations throughout the winter months. The expansive, open warehouse space required heat for multiple applications, including ground thawing, concrete curing, heating hoardings, and maintaining safe and comfortable conditions for workers.
CASE STUDY | REIC Rentals Ground Thaw Heaters: Reducing Project Delays

A reputable construction contractor faced significant challenges thawing frozen ground in extreme winter conditions. The existing ground thaw technology required extensive labor, long thaw times, and large amounts of space—factors that led to project delays and rising costs.
CASE STUDY | Environmental Control Units: Coatings Industry Success Story

Tank coating is a highly sensitive operation that requires precise control of temperature, humidity, and airflow. Without stable environmental conditions, achieving a uniform and durable coating is extremely challenging.
CASE STUDY | Downtime Reduction Case Study: JetHeat Heater Success Story

To maintain progress during critical phases—such as concrete pouring and shotcreting—the contractor required a dependable heating solution that could perform consistently in extreme winter conditions.
New Construction in Minnesota Relies on Rental Make Up Air Heaters to Maintain Schedule During Winter

During construction of a multi-story facility underway, the job site Superintendent of the project knew that winter would either make or break the project schedule. Protecting their schedule and managing the interior conditions during the winter. The idea was that if they could manage their budget and have temporary heating installed, it may work out.
New Construction on a Storage Facility Proceeds With Temporary Heating During Concrete Pours and Finishing

During the early phases of construction a general contractor sought temporary heating during construction. With exterior walls and roofing nearing completion, both concrete flooring and interior construction would require heating during the cold of a South Dakota winter.
Finishing Stages of Construction in Minnesota – Heating For Contractors, Materials and Equipment

A repeat customer of REIC Rentals requested climate control equipment for several stages of construction on a new building in Minnesota. The contractor approached REIC well before the project broke ground and had outlined the stages that would require climate control. REIC had provided heating the previous year during the brick and concrete phases, cooling and dehumidification during the summer, and was now asked to return for another winter to provide heating for the final stages.
Oil Production Site Learns Benefits and Cost Savings of Jet Heater

During a visit at a production pad where workover activity was being performed, a REIC sales rep noticed rental heaters already in use on the site. After a short conversation they asked the site manager if they would like to experience an alternative?
Multi-Year Dam Construction Project Relied On REIC For Heating And Climate Control, Year After Year

Constructing a dam with more than two million cubic meters of concrete requires a massive effort of manpower and equipment. Year after year as the project continued, REIC became more essential to the success of this project than ever imagined.